Files @ r24601:dbb2ed121b40
Branch filter:

Location: cpp/openttd-patchpack/source/.github/ISSUE_TEMPLATE.md

Patric Stout
Fix: replacing a bridge didn't charge for clearing last tile

It only considered the end-tile (or start-tile) for the bridge,
instead of both. This is obvious in the rest of the code which
constantly does "+ 2"; this being the only place that does a "+ 1".
1
2
3
4
5
6
7
## Version of OpenTTD

## Expected result

## Actual result

## Steps to reproduce