Files
@ r24601:dbb2ed121b40
Branch filter:
Location: cpp/openttd-patchpack/source/bin/scripts/on_client.scr.example
r24601:dbb2ed121b40
66 B
text/plain
Fix: replacing a bridge didn't charge for clearing last tile
It only considered the end-tile (or start-tile) for the bridge,
instead of both. This is obvious in the rest of the code which
constantly does "+ 2"; this being the only place that does a "+ 1".
It only considered the end-tile (or start-tile) for the bridge,
instead of both. This is obvious in the rest of the code which
constantly does "+ 2"; this being the only place that does a "+ 1".