Files @ r24602:d0d308decaa4
Branch filter:

Location: cpp/openttd-patchpack/source/.dorpsgek.yml

Patric Stout
Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation

This means that for rail tunnel/bridges, the rail is first sold,
and the tunnel/bridge is destroyed after. This means destroying
tunnels/ bridges now often makes you money, instead of costing.

Similar, with road/tram tracks. Destroying a road+tram
tunnel/bridge now costs the same amount of money as first
removing the tram tracks and than destroying the road
tunnel/bridge. Especially as tram tracks generate money when
removing, this is a noticeable difference.
notifications:
  global:
    irc:
      - openttd
      - openttd.notice

  push:
    only:
    - master
    only-by:
    - DorpsGek
  commit-comment:
  pull-request:
  issue:
  tag-created: