Patric Stout
Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation

This means that for rail tunnel/bridges, the rail is first sold,
and the tunnel/bridge is destroyed after. This means destroying
tunnels/ bridges now often makes you money, instead of costing.

Similar, with road/tram tracks. Destroying a road+tram
tunnel/bridge now costs the same amount of money as first
removing the tram tracks and than destroying the road
tunnel/bridge. Especially as tram tracks generate money when
removing, this is a noticeable difference.
1
2
3
4
5
6
7
8
9
root = true

[*]
insert_final_newline = true
trim_trailing_whitespace = true

[*.{c,cpp,h,hpp}]
indent_style = tab
charset = utf-8