Files
@ r24602:d0d308decaa4
Branch filter:
Location: cpp/openttd-patchpack/source/.gitignore
r24602:d0d308decaa4
81 B
text/plain
Fix #7656: destroying a tunnel/bridge now first removes the tracks for cost calculation
This means that for rail tunnel/bridges, the rail is first sold,
and the tunnel/bridge is destroyed after. This means destroying
tunnels/ bridges now often makes you money, instead of costing.
Similar, with road/tram tracks. Destroying a road+tram
tunnel/bridge now costs the same amount of money as first
removing the tram tracks and than destroying the road
tunnel/bridge. Especially as tram tracks generate money when
removing, this is a noticeable difference.
This means that for rail tunnel/bridges, the rail is first sold,
and the tunnel/bridge is destroyed after. This means destroying
tunnels/ bridges now often makes you money, instead of costing.
Similar, with road/tram tracks. Destroying a road+tram
tunnel/bridge now costs the same amount of money as first
removing the tram tracks and than destroying the road
tunnel/bridge. Especially as tram tracks generate money when
removing, this is a noticeable difference.